Hwy 61 At Alcorn University Exit
|
I-55 Low Mast Lighting Digging Hole
Shot No. 1
|
I-55 Low Mast Lighting Digging Hole
Shot No. 2
|
I-55 Low Mast Lighting Checking Depth
Shot No. 3
|
I-55 Low Mast Lighting - Operating Digger Truck Shot No. 4
|
I-55 Low Mast Lighting Placing Footings On Conduit Cage
Shot No. 5
|
I-55 Low Mast Lighting Trenching for Conduit
Shot No. 6
|
I-55 Low Mast Lighting Placement Of Conduit Cage
Shot No. 7
|
I-55 Low Mast Lighting Conduit Cage Is In The Hole
Shot No. 8
|
I-55 Low Mast Lighting - Exothermic (CAD) Welding Shot No. 9
|
I-55 Low Mast Lighting CADWELD One Shot In Process Shot No. 10
|
Crew Setting 100 Ft Pole On I-55 In Southaven, MS Shot #1
|
Crew Setting 100 Ft Pole On I-55 In Southaven, MS Shot #2
|
Crew Setting 100 Ft Pole On I-55 In Southaven, MS Shot #3
|
Directing Crew While Setting 100 Ft Pole On I-55 In Southaven, MS Shot #4
|